CONSTRUCTION & DEVELOPMENT UPDATES

A valued and unique heritage

The Locomotive Workshop building is listed, along with all its machinery collection, on the NSW State Heritage Register. The entire site is also included as part of the Eveleigh Railway Workshops listing on the NSW State Heritage Register.

The machinery collection is predominantly housed in static displays in Bays 1 and 2 as well as a small number of other locations throughout the remainder of the Locomotive Workshop.

The revitalisation plan,

Our carefully considered plans to revitalise the iconic Locomotive Workshop will deliver a unique cultural and innovation hub for Sydney, preserving and celebrating this magnificent history whilst making it accessible for everyone to enjoy.

Our submission for the sensitive conversion and adaptive re-use of the Locomotive Workshop has been approved by the Independent Planning Commission NSW through the submission of two SSDAs. These relate to the Eastern portion (Bays 1-4a) and the Western portion (Bays 5-13 and 15) with delivery now well underway. 

Managing the movable heritage collection,

A draft management plan for the Eveleigh Locomotive Workshop machinery collection has been prepared for South Eveleigh in conjunction with an audit of our collection. Links to these documents are listed below:

Heritage Interpretation Strategy

Please find a link to Mirvac's latest Heritage Interpretation Strategy for South Eveleigh as of November 2016.

Locomotive Workshop - Stage 2 Heritage Interpretation Plan was recently approved on 6 September 2019. Relevant documents are listed below:

Site-specific, non-standard exemptions from the Heritage Act 1977

In 2015 the NSW Minister for Heritage granted South Eveleigh site-specific exemptions from approvals required under section 57 (1) of the Heritage Act 1977. Read more in NSW Government Gazette No. 22 - Government Notices.

SSDA8449 - Commercial

1. SSDA 8517 RFI Response
2. Construction Pedestrian Traffic Management Plan
3. Green Travel Plan
4. LW Construction program
5. Blacksmith Operational Plan of Management - FINAL
6. ATP Conservation Managament Plan (CMP)
7. ATP Remedial Action Plan
8. Updated Community Communications Strategy
9. Compliance Monitoring & Reporting Program
10. Construction Noise Vibration Management Plan
11. Heritage Asset Management Strategy 2013-2018 (HAMS)
12. Independent Audit Program
13. Pre Construction Compliance Report
14. Moveable Collection Management Plan
15. Waste Management Plan
16. Air Quality Management Plan
17. REMP
18. Bays 5-15 Site Plan
19. Existing and Demolition Plan – Ground Floor
20. Existing and Demolition Plan – First Floor
21. Existing and Demolition Plan – Second Floor
22. Existing and Demolition Plan – Roof
23. Existing Elevations
24. Demolition Elevations
25. Existing Sections
26. Demolition Sections
27. Proposed Plan - Ground Floor
28. Proposed Plan - First Floor
29. Proposed Plan - Second Floor
30. Proposed Roof
31. Proposed Elevations
32. Proposed Sections
33. Signage – Key Plan
34. Development Consent Conditions
35. Stamped Development Plans
36. RTS Report
37. Environmental Impact Assessment
38. Stage 1 Heritage Interpretation Strategy
39. Attachment A - SSD 8517 and SSD 8449 Updated Community Communications Strategy 28 March 2019
40. SSD 8449 MOD 2 Signed Consent
41. SSD 8449 Construction Compliance Report REV1 
42. Loading Dock Management Plan Version 2
43. Addendum Stage 1 HIP - Attachment C - REV3
44. Attachment A - Final Stage HIP
45. Instrument of Determination - MOD 5 SSD 8449
46. Instrument of Modification MOD 1 SSD 8449
47. Instrument of Modification MOD 4 SSD 8449
48. Locomotive Workshop Construction Compliance Report 2 SSD 8449 REV1
49. Locomotive Workshop WTP - Final Report
50. Parking - No Parking - Rosehill Street, Redfern
51. Printed minutes 19032020 0930 Local Pedestrian Cycling and Traffic Calming Committee
52. Rainwater Harvesting and Recycled Water Reuse Strategy Comparative Assessment REV4 10092019
53. Signed Modification Instrument MOD3 SSD 8449
54. Signed SSD8449 MOD 6 Instrument of Modification
55. SSD8449 Independent Audit 1 Mirvac Response
56. SSD8449 Locomotive Workshop IEA RAmboll 318000649 Final 1 31102019
57. SSD8449 MOD 7 Instrument of Modification
58. Stage 2 HIP Design Document

60. Instrument of Modification MOD 9, SSD 8449

61. Mod 10 Instrument of Modification_SSD 8449

62. Commercial Construction Compliance Report 2 SSD 8449

63. Commercial Pre-Operation Compliance Report SSD 8449 

64. Construction Compliance Report 4 SSD 8449 

65. Construction Compliance Report 3 SSD 8449 Rev 3

66. Long Term EMP Locomotive Workshop Stage 1ABC, Travelator and Stage 2_Rev 0

67. SSD 8449 Modification 11 Instrument 

68. SSD 8449 Modification 12 Instrument

69. SSD 8449_2020 Independent Environmental Audit 

70. SSD 8449_2020 Audit_Mirvac Responses

71. GFA Plans Bays 5-15 

72. SK_0851 Grid 8 Glazing Study 

73. Intertenancy Walls, Internal Elevations / Section (SA-AR-DWG-BB-B4-4220 (F))

74. Intertenancy Walls, Internal Elevations / Section (SA-AR-DWG-BB-B4-4221 (A))

75. Bay 15 Section - West Wall (SK_0867)

76. Bay 15 South Timber Platform - Demolition Plans (SK_0942 (A))

77. Bay 15 South Timber Platform - Demolition Section (SK_0943 (A))

78. Compliance Report 5 (SSD 8449)

79. SSD 8449 Locomotive Workshop - Second IEA Report 

80. SSD 8449 Second Audit - Mirvac Responses 

81. SSD 8449 - Locomotive Workshop IEA Report_27_April_2022

82. SSD 8449 - Third Audit_Mirvac Responses 

 

 

 

SSDA8517 - Retail

1. SSDA 8449 RFI Response
2. Construction Pedestrian Traffic Management Plan
3. Green Travel Plan
4. Locomotive Workshop Construction Program
5. Blacksmith Operational Plan of Management
6. ATP Conservation Management Plan (CMP)
7. ATP Remedial Action Plan
8. Compliance Monitoring & Reporting Program
9. Construction Noise Vibration Management Plan
10. Heritage Asset Management Strategy 201302018 (HAMS)
11. Independent Audit Program
12. Stamped Development Plan
13. Locomotive Workshop – Public Domain Response to Submissions
15. Pre-construction Compliance Report
16. Moveable Collection Management Plan
17. Waste Management Plan
18. Air Quality Management Plan
19. Locomotive Workshop REMP
20. Site Plan
24. Existing Demolition Plan – Second Floor
25. Existing Demolition Plan – Roof
26. Existing Elevations
27. Demolition Elevations
28. Existing Sections
29. Demolition Sections
30. Proposed Plan – Ground Floor
31. Proposed Plan – First Floor
32. Proposed Elevations
33. Proposed Sections
34. GFA Plans
35. Signage Elevations
36. Travelator Excavation Extent
37. Travelator Plans
38. Travelator Sections
39. Proposed Perm Land Use Plan – Ground Floor
40. Proposed Perm Land Use Plan – First Floor
41. Proposed Temp Land Use Plan – Ground Floor
42. Proposed Temp Land Use Plan – First Floor
43. Development Consent
44. RTS Report
45. Environmental Impact Statement
46. Stage 1 Heritage Interpretation Strategy
47. Addendum Stage 1 Heritage Interpretation Strategy
48. Attachment A - SSD 8517 and SSD 8449 Updated Community Communications Strategy 28 March 2019
49. SSD 8517 MOD 2 Signed Consent
50. SSD 8517 Compliance Report REV1
52. Attachment A - Final Stage 2HIP
53. Instrument of Determination - MOD 5 SSD 8517
54. Instrument of Modification MOD 1 SSD 8517
55. Instrument of Modification MOD 3 SSD 8517
56. Locomotive Workshop Construction Compliance Report 2 SSD 8517
57. Locomotive Workshop Loading Dock Management Plan 2
58. Locomotive Workshop WTP - Final Report
59. Parking - No Parking - Rosehill Street, Redfern
60. Printed minutes 19032020 0930 Local Pedestrian Cycling and Traffic Calming Committee
61. R051 (Long term EMP Locomotive Workshop Stage 1A and 1B) REV0
62. Rainwater Harvesting and Recycled Water Reuse Strategy Comparative Assessment REV4 10092019
63. Signed SSD 88517 MOD 5 Instrument of Modification
64. SSD8517 MOD 3 Plans
65. SSD8517 Independent Audit 1 Mirvac Response
66. SSD8517 Locomotive Workshop IEA RAmboll 318000649 Final 1 31102019
67. Stage 2 HIP Design Document

68. Mod 8 Instrument of Modification SSD 8517

69. SSD 8517 MOD 6 Consent

70. SSD 8517 B37 Drawings Set

71. SSD 8517 R054 (Long term EMP Locomotive Workshop Stage 1ABC) Rev 0

72. Retail Compliance Report 2 SSD 8517

73. Compliance Report 2 SSD 8517_Rev2

74. Compliance Report 3 SSD 8517

75. Pre-operation Compliance Report SSD 8517

76. SSD 8517 MOD 9 Instrument of Modification 

77. SSD 8517_2020 Audit_Mirvac Responses 

78. SSD 8517_2020 Independent Environmental Audit 

79. Existing and Demolition Plan – Ground Floor (SA-AR-DWG-BB-B4-0310 (L))

80. Existing and Demolition Plan – First Floor (SA-AR-DWG-BB-B4-0311 (L))

81. Proposed Plan - Roof (SA-AR-DWG-BB-B4-0334 (W))

82. Proposed Temporary Land Uses - First Floor (SA-AR-DWG-BB-B4-0393 (G))

83. Landscape Plan (L_Base Master)

84. Independent Audit Report 3 (SSD 8517)

85. Independent Audit 3 (SSD 8517) - Mirvac Responses

86. Operation Compliance Report (SSD 8517)

87. Second Audit Mirvac Responses Rev 2 (SSD 8517)

88. Third Audit Mirvac Responses (SSD 8517) 

locomotive workshops redfern
steam boilers redfern eveleigh
indigenous rooftop farm